VCE General Maths Networks and Decision Mathematics 2022 Exam 1 Mini Test

VCAA General Maths Exam 1

This is the full VCE General Maths Exam with worked solutions. You can also try Mini-Tests, which are official VCAA exams split into short tests you can do anytime.

Number of marks: 8

Reading time: 3 minutes

Writing time: 18 minutes

Instructions
• Answer all questions in pencil on your Multiple-Choice Answer Sheet.
• Choose the response that is correct for the question.
• A correct answer scores 1; an incorrect answer scores 0.
• Marks will not be deducted for incorrect answers.
• No marks will be given if more than one answer is completed for any question.
• Unless otherwise indicated, the diagrams in this book are not drawn to scale.


Networks and decision mathematics - 2022

Question 1 [2022 Exam 1 M2 Q1]

The network below shows the distances, in kilometres, along a series of roads.

The vertices \(A, B, C, D, E, F, G\) and \(H\) represent the intersections of these roads.

Network diagram with 8 vertices and weighted edges.

Prim’s algorithm can be used to find the

  • A. critical path.
  • B. shortest path.
  • C. minimum cut.
  • D. minimum allocation.
  • E. minimum spanning tree.
Correct Answer: E
Click here for full solution
Question 2 [2022 Exam 1 M2 Q2]

The map below shows seven countries within Central America.

Map of Central America.

A network diagram was drawn with seven vertices to represent each of the countries on the map of Central America. Edges were drawn to represent a border shared between two countries.

The number of edges that this network has is

  • A. 5
  • B. 6
  • C. 7
  • D. 8
  • E. 9
Correct Answer: C
Click here for full solution
Question 3 [2022 Exam 1 M2 Q3]

An athletics club needs to select one team of four athletes.

The team is required to have one long jump, one high jump, one shot put and one javelin competitor.

The following table shows the best distances, in metres, for each athlete for each event.

Athlete Long jump (m) High jump (m) Shot put (m) Javelin (m)
Eve 4.8 1.7 13.1 40.9
Harsha 4.8 1.6 13.9 39.5
Shona 5.1 1.8 14.4 41.2
Taylor 4.8 1.7 12.8 39.8

The athletics club will allocate each athlete to one event in order to maximise the total distance that the team jumps and throws.

Which allocation of athlete to event must occur in order to maximise the total distance?

  • A.
    long jump high jump shot put javelin
    Shona Harsha Eve Taylor
  • B.
    long jump high jump shot put javelin
    Shona Taylor Harsha Eve
  • C.
    long jump high jump shot put javelin
    Eve Harsha Taylor Shona
  • D.
    long jump high jump shot put javelin
    Harsha Taylor Shona Eve
  • E.
    long jump high jump shot put javelin
    Harsha Taylor Eve Shona
Correct Answer: D
Click here for full solution
Question 4 [2022 Exam 1 M2 Q4]

Consider the graph below.

A graph with 6 vertices and 15 edges (K6).

The number of edges that need to be removed for this graph to be planar is

  • A. 0
  • B. 1
  • C. 2
  • D. 3
  • E. 4
Correct Answer: A
Click here for full solution
Question 5 [2022 Exam 1 M2 Q5]

A connected graph consists of five vertices and four edges.

Which one of the following statements is not true?

  • A. The graph could be a tree.
  • B. The graph could be planar.
  • C. The graph could be bipartite.
  • D. The graph could contain a path.
  • E. The graph could contain a cycle.
Correct Answer: E
Click here for full solution
Question 6 [2022 Exam 1 M2 Q6]

A landscaping project has 12 activities. The network below gives the time, in hours, that it takes to complete each activity.

Activity network for a landscaping project.

The earliest start time, in hours, for activity \(G\) is

  • A. 10
  • B. 11
  • C. 12
  • D. 13
  • E. 14
Correct Answer: C
Click here for full solution

Use the following information to answer Questions 7 and 8.

A project involves 11 activities, \(A\) to \(K\).

The table below shows the earliest start time and duration, in days, for each activity.

The immediate predecessor(s) of each activity is also shown.

Activity Earliest start time Duration Immediate predecessor(s)
A 0 6
B 0 7
C 6 10 A
D 6 7 A
E 7 8 B
F 15 2 D, E
G 15 2 E
H 17 3 G
I 20 6 C, F, H
J 17 5 G
K 26 2 I, J
Question 7 [2022 Exam 1 M2 Q7]

A directed network for this project will require a dummy activity.

The dummy activity will be drawn from the end of

  • A. activity \(A\) to the start of activity \(D\).
  • B. activity \(E\) to the start of activity \(F\).
  • C. activity \(F\) to the start of activity \(I\).
  • D. activity \(G\) to the start of activity \(H\).
  • E. activity \(I\) to the start of activity \(J\).
Correct Answer: B
Click here for full solution
Question 8 [2022 Exam 1 M2 Q8]

When this project is completed in the minimum time, the sum of all the float times, in days, will be

  • A. 0
  • B. 16
  • C. 18
  • D. 20
  • E. 28
Correct Answer: D
Click here for full solution

End of Multiple-Choice Question Book

VCE is a registered trademark of the VCAA. The VCAA does not endorse or make any warranties regarding this study resource. Past VCE exams and related content can be accessed directly at www.vcaa.vic.edu.au

>